# Product Launch Readiness Planner

> Enter your target launch date, team bandwidth, and existing assets to get a 6-pillar readiness score and a dated 14, 30, 60, or 90-day plan with .ics and CSV export.

Canonical: https://waitlyze.com/tools/product-launch-checklist
Last updated: 2026-11-22


The Product Launch Readiness Planner scores your launch preparation from 0 to 100 across six operational pillars and builds a dated 14-, 30-, 60-, or 90-day critical-path timeline based on your target launch date and weekly bandwidth. Export your dated tasks to Calendar (.ics), CSV, or attach them directly to a Waitlyze campaign.

## How readiness and critical-path dates are computed
Your readiness score weights the six dependencies that most commonly derail pre-launch campaigns, then schedules every incomplete task backward from your target launch date.

**Formula / Model:** `Readiness (0–100) = Page & Value Prop (20) + Audience & Waitlist (20) + Email & DNS (18) + Proof & Assets (16) + Distribution & UTMs (14) + Measurement (12)`

- **Phase 1: Validation & Waitlist Setup**: Domain, landing page, signup form, email verification, and baseline analytics live first so every outreach click is captured.
- **Phase 2: Warm-Up & Referral Seeding**: Founder network seeding, UTM-tagged channel distribution, welcome sequence, and referral reward validation.
- **Phase 3: Launch Week Rehearsal**: DNS deliverability verification, signup/referral end-to-end test, and launch-day asset staging.
- **Phase 4: Launch Day & Rollout**: Staged beta invites, broadcast send to verified opt-ins, and 7-day conversion follow-up.

## Worked Example: Worked example: 30-day private beta launch (solo founder, 8 hrs/week)
Domain and demo screenshots exist; waitlist form, welcome email, UTMs, and DNS records are still pending.
- **Readiness score**: 36 / 100
- **First critical task**: Publish waitlist & verify double opt-in (Day 1)
- **Recommended horizon**: 30-day sprint (14 prioritized tasks)
- **Exports**: .ics Calendar + CSV + Markdown

## How to Interpret Your Result
- **80–100 (Launch ready)**: Run one full rehearsal signup using a real inbox, verify your DNS records, and schedule your launch-day rollout.
- **45–79 (In progress)**: Prioritize Phase 1 and Email/DNS setup before announcing publicly so early traffic does not bounce or land in spam.
- **Below 45 (Early setup)**: Start with one live waitlist page today rather than waiting for every asset. Collecting verified emails early validates demand while you build.

## Methodology & Privacy
- **Author**: Waitlyze Product Team (Reviewed by Falak Gala)
- **Last updated**: 2026-11-22
- **Privacy**: Launch dates, asset states, and calendar exports are calculated locally in your browser.

## Frequently Asked Questions
### How far ahead of launch should I publish my waitlist?
For most indie and SaaS launches, 30 to 60 days gives enough runway to test messaging, seed referrals, and warm up your sending domain without letting early subscribers go cold.

### What does the .ics calendar export include?
It generates a standard RFC 5545 iCalendar file containing each incomplete task scheduled on its exact target date, importable into Apple Calendar, Google Calendar, or Outlook.

### Does the checklist carry over into my Waitlyze workspace?
Yes. Clicking the primary CTA saves your launch plan in a ToolBlueprint so you can review your checklist directly inside your new campaign.

## Related Links
- [Waitlyze Launch Lab](https://waitlyze.com/tools) - All 14 free pre-launch tools
- [Recommended Template](https://waitlyze.com/templates/saas) - Preview matching waitlist layout
